Skip to content
Portfolio

Recently handed over

A short, honest selection — every project below was photographed after the owners moved in, not staged for a catalogue.

Courtyard villa interior in Damansara Heights with layered natural light
Damansara Heights · BungalowCourtyard Villa

A 1980s bungalow re-centred on an internal courtyard. Walls came down between kitchen, dining and garden; teak screens now filter the western sun instead of curtains blocking it. The owners asked for a house that would feel cool without air-conditioning until noon — cross-ventilation studies made it happen.

  • Scope: full design & build
  • Duration: 9 months
  • Completed: 2025

Muted penthouse lounge in Mont Kiara with floor-to-ceiling glazing
Mont Kiara · PenthousePenthouse in Repose

A duplex penthouse for a couple returning from a decade in Copenhagen. The brief was one word: quiet. Limed oak, undyed linen and a palette borrowed from the evening haze over the city. Every cable, charger and appliance lives behind flush joinery — the rooms hold nothing they do not need.

  • Scope: interior design & joinery
  • Duration: 22 weeks
  • Completed: 2025

Restored heritage semi-detached house in Ampang with modern kitchen
Ampang · Semi-DHeritage Semi-D

A 1970s semi-detached house inherited from the owner's grandparents. We kept the terrazzo stairs, original grille work and the deep front verandah, then rebuilt everything the eye does not see: wiring, plumbing, roof insulation. The result reads as a careful continuation rather than a replacement.

  • Scope: renovation & restoration
  • Duration: 6 months
  • Completed: 2024

Gallery-style office reception with curated artwork near KLCC
KLCC · WorkplaceGallery Office

A regional advisory firm wanted clients to feel they had walked into a collection, not a corridor of cubicles. Museum-grade lighting tracks, a reception desk cut from a single slab of local granite, and acoustic panelling disguised as art walls. Delivered four days ahead of the tenancy deadline.

  • Scope: commercial fit-out
  • Duration: 11 weeks
  • Completed: 2024

Want to see more of a particular project type?

We share extended case files — budgets included — during consultations.

Request Case Files